Town of Breckenridge: 0.40 MG Woodmoor 2 Finished Water Storage Tank Rehabilitation Project. The project primarily consists of providing temporary water storage; installation of a new hydrant and assembly; installation of new roof hatch and riser; installation of a new center roof vent and riser; installation of new exterior ladder and safety cage; magnetic flux leakage scan and floor plate repairs; exterior insulation removal, surface preparation and recoating; new exterior level gauge; new impressed current cathodic protection system; new solar mixer, and interior surface preparation and coatings.
Agency contact for this bid is Town of Breckenridge bidrequest2021@outlook.com
*Bid specifications not available for past bids.
Our nation-wide team looks for bids in every agency to ensure the most comprehensive coverage available. We are the lowest cost bid service provider nationwide, but we don't sacrifice quality for price.