Envirobidnet Logo
Grow your business, change the world 30 Day Free Trial

San Antonio, TX Sample Bid Opportunity #709303

30 Day Free Trial
Get bids delivered directly to your inbox FOUR TIMES DAILY, no credit card required!
Construction Manager Examining Bid 709303 in San Antonio,  TX
Please note this bid is EXPIRED and is SAMPLE content of what we offer to our paid subscribers

(RFQ) The San Antonio Water System 2800 U.S. Hwy 281 North - San Antonio, TX

Consulting/Engineering

(PS-00132) The San Antonio Water System : (RFQ) Independent Cost Estimating Services. The following includes the general scope of services needed for the Project as part of this Solicitation. The extent and details of the scope of services needed for the Project will be negotiated after the selection of the Consultant(s). These services include, but are not limited to, the following: 1. Prepare independent construction cost estimates at 90% design phase for selected projects. Cost estimate shall be a Class 1 Estimate as described in AACE International Recommended Practice No. 17R-97 and 56R-08. 2. Conduct meetings with SAWS, as needed, to define scope of work order, availability, and condition of documents (plans, specifications, reports, etc.), and other items that may impact the work. 3. Review design submittals prepared by Engineer, make as many site visits as needed to become familiar with the Project areas prior to preparing the scope of services and fee for the Individual Project Work Order. 4. Negotiate scope, budget, and schedule for every task in advance of 90% deliverables for the project. 5. Conduct a meeting with SAWS Engineering staff and the Design Engineer, to go over the project details, deliverables prepared by the Design Engineer, and identify items that may impact the preparation of the independent estimate. This should include key technical components, critical equipment and materials, specialized construction methods, key subcontractors, special conditions, construction sequencing, construction duration, unique project circumstances given its location and surroundings, project risks, special coordination requirements, and anything else about the project scope that might impact cost and schedule from the Contractor’s perspective. 6. Prepare a letter report type deliverable that includes a construction cost estimate, summary of assumptions made in preparation of the estimate, identifies project risks, and identifies items that were not clearly defined in the Contract Documents and that may affect the estimate. The report should include the summary page of the construction cost estimate in the same format as the Design Engineer, reflecting the structure of the bid tab or price proposal. 7. Conduct meetings with SAWS, as needed, to deliver the independent construction estimate and summarize key items identified in the letter report (e.g., unclear items, risk items, assumptions made, missing pay items, incomplete information, significant differences from Engineer’s OPCC,etc.). 8. Meet with SAWS and Design Engineer to go over the differences and understand implications for the project if difference between Engineer’s estimate and the Independent Construction Estimate prepared by the Design Engineer is greater than 20%. Provide an overview of reasons for these differences to understand where these differences stem from and work to reconcile the gap between the two estimates. 9. Ensure independent construction cost estimate takes into consideration local market conditions, bidding environment, availability of equipment and materials, price escalation, labor prices and availability, and contractor availability.

Agency contact for this bid is Lindsay Esquivel Lindsay.Esquivel@saws.org

https://apps.saws.org/business_center/contractsol/drill.cfm?id=4099

*Bid specifications not available for past bids.

Envirobidnet posts hundreds of bids like this one.

Our nation-wide team looks for bids in every agency to ensure the most comprehensive coverage available. We are the lowest cost bid service provider nationwide, but we don't sacrifice quality for price.

View similar bids in these categories:

More Sample Consulting and Engineering Bids

We offer a 30 Day Free Trial with no credit card and no commitment.

Start Free Trial
Don't lose out on a job because you missed the RFP.
Staying on top of all the bids at all the sources is time-consuming. Unless you’re on top of it, you can easily miss a bid and lose out on business without even knowing it.
Lost opportunities are costing you business.
We gather all the bids in your state and across the country so you don't have to.
At Envirobidnet, you'll get Daily Email Notifications, Access to our nation-wide database 24 hours a day, FREE ACCESS to all bid addenda (as available), and much more!
menu
Your free trial is a few clicks away
Envirobidnet posts hundreds of bids like this one! Sign up for a 30-Day no-obligation free trial, no credit card required.
x Close