Umatilla: Pedestrian Bridge and Utilities Replacement. Work will include: Construction of a 205-foot single span prefabricated steel truss pedestrian bridge requiring portions of in water work. Asphalt pavement for pedestrian pathway improvements, embankment and backfill, subgrade stabilization, rock excavation, structure excavation, bridge removal work, MSE retaining walls, coping and pedestrian railings, riprap and geotextile, structural concrete, dewatering around abutments and piers, and crane(s) for girder erection. On bridge work consisting of 18 inch ductile iron water pipe, 30 inch steel casing pipe, 30 inch pipe hanger assemblies, GRC conduit and 4 inch pipe hanger assemblies. Off bridge work consisting of 18 inch ductile iron water pipe and associated valves/fittings/couplings, 4 inch GRC conduit, 4 inch PVC conduit, and other work in accordance with the contract documents.
Agency contact for this bid is J-U-B ENGINEERS, Inc. 509-783-2144
*Bid specifications not available for past bids.
Our nation-wide team looks for bids in every agency to ensure the most comprehensive coverage available. We are the lowest cost bid service provider nationwide, but we don't sacrifice quality for price.