Clark Co: Dam #2 Rehabilitation. Structural repairs to Dam #2 including crack sealing, concrete surface repair, epoxy injection crack repair, pier repair, concrete sealing, the installation of a new 4-FT chain link fence, and the installation of medium riprap adjacent to the abutments.
Agency contact for this bid is Collins Engineering mhelland@collinsengr.com
*Bid specifications not available for past bids.
Our nation-wide team looks for bids in every agency to ensure the most comprehensive coverage available. We are the lowest cost bid service provider nationwide, but we don't sacrifice quality for price.