Tigard: *Addenda#1-3* Kruger Creek Stabilization project. The project generally consists of the following (the Work): 1. Installation of approximately 1,300 linear feet of 24-inch and 30-inch storm drainage pipe by trenching. 2. Installation of approximately 175 linear feet of 28-inch storm drainage pipe by slip lining. 3. Installation of storm drainage structures 4. Erosion and sediment control with in-water work, general excavation and slope stabilization. 5. Installation of rock buttress slope stabilization. 6. Creek bed restoration and stream enhancement. 7. Installation of gabion mesh retaining wall. 8. Gravel maintenance road rehabilitation. 9. Tree and invasive species removal. 10. Clean Water Services vegetated corridor seeding, planting, surface restoration, and maintenance period. 11. All other work required by the construction plans and specifications to rehabilitate Kruger Creek and stabilize adjacent slopes. Basis of Bid Award shall incorporate all items identified on the Bid Schedule. *Due date is revised to June 7, 2022.*
*Bid specifications not available for past bids.
Our nation-wide team looks for bids in every agency to ensure the most comprehensive coverage available. We are the lowest cost bid service provider nationwide, but we don't sacrifice quality for price.