McAlester Public Works Authority: EAST WASTEWATER TREATMENT PLANT FLOW EQUALIZATION BASIN SLUDGE REMOVAL AND LINER INSTALLATION PROJECT The project generally consists of the removal and mechanical dewatering of approximately 3 million gallons of sludge from the 9 million gallon Flow Equalization Basin (FEB9), hauling to and disposal of the dewatered sludge at the McAlester Municipal Landfill, removal and disposal of the existing HDPE liner and associated geotextile fabric liner, installation of approximately 152,000 square feet of new 60 mil HDPE liner, installation of a new french drain, outlet pipe, and geotextile fabric liner in FEB9