RUTHVEN: CONSTRUCTION OF WATER SYSTEM IMPROVEMENTS – NEW WATER WELL #4. New Water Well #4 – (November 1, 2022 Substantial Completion). Construction of a new 220 gpm water well located SW of the intersection of 355th Ave and Lincoln St. Construction and connections of a 4” transmission water main (directional drill) from the well site, along 355th Ave, along Highland St, and to the existing water main behind water plant. Electrical service connections and controls located at the well location and 1204 Burns St Seeding and fertilizing and other surface replacement. Miscellaneous work to complete project New Water Well #4 – Alternate 1 – (November 1, 2022 Substantial Completion) Construction of a new 220 gpm water well located SW of the intersection of 355th Ave and Lincoln St. Construction and connections of a 4” transmission water main (open cut) from the well site, along 355th Ave, along Highland St, and to the existing water main behind water plant. Electrical service connections and controls located at the well location and 1204 Burns St Seeding and fertilizing and other surface replacement Miscellaneous work to complete project.
Agency contact for this bid is ISG (515) 243-9143
*Bid specifications not available for past bids.
Our nation-wide team looks for bids in every agency to ensure the most comprehensive coverage available. We are the lowest cost bid service provider nationwide, but we don't sacrifice quality for price.
Envirobidnet posts bids across the environmental sector, just like this one. Sign up for a 30-Day no obligation free trial, no credit card required.
x Close