(751/21231.JBB) Baraga County: Lateral Creek Bridge Replacement. Project Scope of Work: Removal of the existing temporary steel bridge, removal of the existing collapsed concrete structure. Drive new timber pilings, construct new timber abutment walls, install timber superstructure, timber decking and wearing surface, backfill structure, install new signs, place gravel approaches, place riprap on the waterward side of the new timber abutment walls, place erosion control measures and site restoration.
Agency contact for this bid is KRISTI ZAKRZEWSKI 517-243-5669 ZakrzewskiK@michigan.gov
https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService
*Bid specifications not available for past bids.
Our nation-wide team looks for bids in every agency to ensure the most comprehensive coverage available. We are the lowest cost bid service provider nationwide, but we don't sacrifice quality for price.
Envirobidnet posts bids across the environmental sector, just like this one. Sign up for a 30-Day no obligation free trial, no credit card required.
x Close