(20577) PennDOT, OLIVER: (20577) R&R EXISTING SUPERSTRUCTURE WITH FULL WIDTH CONST, Oak Hall Road Bridge. Project Cost Range: $1,000,000.00 - $2,499,999.99. This project consists of the superstructure replacement of SR 1024 over Buffalo Creek, construction of a soldier pile and lagging wall, masonry repairs, scour protection, associated roadway, guide rail, signing & pavement marking, drainage, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 1024, SECTION 006, in PERRY COUNTY, OLIVER TOWNSHIP, from 700 feet north of North Front Street at Segment 0090 Offset 0557 to Buffalo Creek Road at Segment 0090 Offset 1207, for an overall project length of 550.00 linear feet (0.104 mile).
Agency contact for this bid is Jeff Costanzo 717-214-4035
http://www.dot14.state.pa.us/ECMS/
*Bid specifications not available for past bids.
Our nation-wide team looks for bids in every agency to ensure the most comprehensive coverage available. We are the lowest cost bid service provider nationwide, but we don't sacrifice quality for price.
Envirobidnet posts bids across the environmental sector, just like this one. Sign up for a 30-Day no obligation free trial, no credit card required.
x Close