(RFQ-22-004SB ) Snohomish County: Design Services, Granite Falls Bridge 102. Project Description: Snohomish County Public Works proposes to replace Granite Falls Bridge #102 that carries the Mountain Loop Highway over the South Fork of the Stillaguamish River. The County has a Design Memorandum (August 2018) that describes the preferred bridge as a two-span steel girder bridge spanning 350 feet. The proposed section includes two lanes, two bike lanes, and sidewalks. A Snohomish County Public Utility District waterline requires relocation. The existing 87-year-old bridge is proposed to be removed. The project is funded for construction and is currently scheduled to begin construction in 2025 and end in 2026. Estimated start date: September 1, 2022 and end date December 31, 2026 The proposed work under this RFQ includes, but is not limited to: Project Management Final Design Services Utility Relocation Services Geotech Engineering NHPA Section 106 and Section 4(f) Compliance Permitting and Planning Construction Phase Services
Agency contact for this bid is Purchasing Division purchasing@snoco.org
https://snoco.procureware.com/Bids
*Bid specifications not available for past bids.
Our nation-wide team looks for bids in every agency to ensure the most comprehensive coverage available. We are the lowest cost bid service provider nationwide, but we don't sacrifice quality for price.
Envirobidnet posts bids across the environmental sector, just like this one. Sign up for a 30-Day no obligation free trial, no credit card required.
x Close