(22.01 and 22.02 ) Farmington: Underground Storage Tank System Removal and Environmental Work. Work includes, but is not limited to disconnection and removal of utilities; removal and proper disposal of concrete paving in the tank area, including the concrete fuel dispense islands and bumper posts; removal and proper disposal of two fuel dispensers, electronic tank monitoring system and associated conduit and wiring, impressed current cathodic protection system wiring, anodes, and rectifier; excavation, removal, and proper disposal of soil/subgrade material surrounding the tanks; removal and proper disposal of liquids from tanks; cleaning of tanks and associated piping; removal and proper disposal of liquids from cleaning; removal, and proper disposal of two tanks complete with fuel and vent piping, sumps, all associated devices and appurtenances, and all electrical/controls conduits and wiring; dewatering as required to perform the work, including proper disposal of same; removal and proper disposal of additional soil/subgrade material as required to address environmental issues, assisting Farmington Public Schools’ consultant in obtaining soil/liquid samples during the work; backfill of excavation, compaction of soil, and installation of new concrete paving
Agency contact for this bid is Karla Swanson 248-789-3332 karla.swanson@fpsk12.net
https://archenvgroup.com/bid-documents/
*Bid specifications not available for past bids.
Our nation-wide team looks for bids in every agency to ensure the most comprehensive coverage available. We are the lowest cost bid service provider nationwide, but we don't sacrifice quality for price.
Envirobidnet posts bids across the environmental sector, just like this one. Sign up for a 30-Day no obligation free trial, no credit card required.
x Close