(CI 19-012 ) Oregon City: *Addendum#1* Scattering Canyon Water Quality/Channel Stabilization Project. The project includes: • Perform all clearing, grubbing, tree removal, and site preparation. • Removal of structures and obstructions and earthwork operations, including 535 CY of unclassified excavation with some anticipated rock. • Installation of erosion and sediment control and site stabilization measures. • Dewater channel using bypass pipe. • Removal and replacement of asphalt pad. • Install new concrete sedimentation manhole and new concrete storm pipe at upstream end of channel. • Replace existing steel storm pipe with new Class 52 ductile iron storm pipe and stabilize outlet to channel. • Construct forebay, rock drop structures, and buried boulder grade control structures. • Temporary and final seeding and planting. • Perform additional and incidental Work as called for by the Specifications and Plans.
Agency contact for this bid is City of Oregon City 503-657-0891
*Bid specifications not available for past bids.
Our nation-wide team looks for bids in every agency to ensure the most comprehensive coverage available. We are the lowest cost bid service provider nationwide, but we don't sacrifice quality for price.
Envirobidnet posts bids across the environmental sector, just like this one. Sign up for a 30-Day no obligation free trial, no credit card required.
x Close