(N/A *w/ADDENDA 1 & 2*) Lebanon: N/A *w/ADDENDA 1 & 2* Lebanon High School Bank Stabilization. The project includes, but is not limited to: stabilization of approximately 32 linear feet of the slope northwest of the Lebanon High School maintenance building using soil nails (minimum factor of safety of 1.3), approximately 24 linear feet of shotcrete-faced soil nail wall (minimum factor of safety of 1.3), and all necessary site work (earthwork, pavement removal and restoration, fence and guiderail removal and restoration, etc.). An add-alternate for the project includes approximately 44 linear feet of mesh-reinforced buttress for an adjoining triangular void in the rock slope.
Agency contact for this bid is Stephen A. Sherk 717-272-7110 ssherk@steckbeck.net
https://pennbid.procureware.com/Bids
*Bid specifications not available for past bids.
Our nation-wide team looks for bids in every agency to ensure the most comprehensive coverage available. We are the lowest cost bid service provider nationwide, but we don't sacrifice quality for price.
Envirobidnet posts bids across the environmental sector, just like this one. Sign up for a 30-Day no obligation free trial, no credit card required.
x Close