(NA) MassDevelopment: (RFQ) *Addenda 1-4* Design and Engineering Services for the Hospital Road Substation Expansion. MassDevelopment is seeking the services of a qualified engineering firm to provide design and engineering services for the design, construction management, and commissioning necessary for the expansion of the 69/13.8kV substation at 111 Hospital Road in Devens, Massachusetts. Services shall include but not be limited to the preparation of above and below grade plans, control and protection plans, specifications for the procurement of substation equipment, and technical evaluation of vendor responses.