Envirobidnet Logo
Grow your business, change the world 30 Day Free Trial

Camden, NJ, PA Sample Bid Opportunity #692121

30 Day Free Trial
Get bids delivered directly to your inbox FOUR TIMES DAILY, no credit card required!
Construction Manager
Please note this bid is EXPIRED and is SAMPLE content of what we offer to our paid subscribers

(Letter of Interest) Delaware River Port Authority One Port Center, 2 Riverside Drive - Camden, NJ, PA

Civil Engineering - all services, Consulting/Engineering

(L00614) Delaware River Port Authority: (L00614) (SOI/LOI) Design and Misc Services, Benjamin Franklin Bridge Improvements. The Municipality will retain a consultant firm for the following: Part Name: Part 1 Project Description: Final design for replacing the wearing surface on the bridge and rehabilitating approach roadway pavement. The project also includes the main finger joints and expansion joints on the approach spans. Part Name: Part 2 Project Description: Construction Phase Services for the BFB Resurfacing. Part Name: Part 3 Project Description: Preliminary Design to improve traffic operations on the eastbound approaches to the BFB, and improve the safety and connectivity for pedestrians and bicycles. Part Name: Part 4 Project Description: Final Design to improve traffic operations on the eastbound approaches to the BFB, and improve the safety and connectivity for pedestrians and bicycles. art Name: Part 5 Project Description: Construction Phase Services for BFB EB Operational Improvements. The BFB is a long span suspension bridge across the Delaware River that connects Philadelphia, Pennsylvania and Camden, New Jersey. The Bridge carries vehicular, rail transit, pedestrian and bicycle traffic. The overall length of main and approach spans is 8,240 feet, and the roadway width is 77’-10”. Parts 1 and 2 include Final Design and Construction Phase Services for the BFB Resurfacing. The proposed improvements include the following: -Replacing the roadway wearing surface on the entire bridge, -Rehabilitating finger plate expansion joints on the suspension spans, -Replacing strip seal expansion joints on approach spans, -Replacing the concrete bridge deck in the vicinity of the Philadelphia 5th Street Pedestrian Tunnel -Rehabilitating approach roadway pavement on both sides of the bridge, and -Reconstructing toll plaza pavement. Parts 3, 4, and 5 include Preliminary Engineering, Final Design, and Construction Phase Services for the BFB EB Operational Improvements: -Realigning the Fifth Street approach north of Race Street and other streetscape improvements to improve bicycle and pedestrian connections to the BFB Walkway.

Agency contact for this bid is Dan Cosgrove Delaware River Port Authority 856-968-2088 d_cosgrove@drpa.org

http://www.dot14.state.pa.us/ECMS

*Bid specifications not available for past bids.

Envirobidnet posts hundreds of bids like this one.

Our nation-wide team looks for bids in every agency to ensure the most comprehensive coverage available. We are the lowest cost bid service provider nationwide, but we don't sacrifice quality for price.

View similar bids in these categories:

More Sample Civil Engineering Bids
More Sample Consulting and Engineering Bids

We offer a 30 Day Free Trial with no credit card and no commitment.

Start Free Trial
Don't lose out on a job because you missed the RFP.
Staying on top of all the bids at all the sources is time-consuming. Unless you’re on top of it, you can easily miss a bid and lose out on business without even knowing it.
Lost opportunities are costing you business.
We gather all the bids in your state and across the country so you don't have to.
At Envirobidnet, you'll get Daily Email Notifications, Access to our nation-wide database 24 hours a day, FREE ACCESS to all bid addenda (as available), and much more!
menu
Your free trial is a few clicks away

Envirobidnet posts bids across the environmental sector, just like this one. Sign up for a 30-Day no obligation free trial, no credit card required.

Start your trial
x Close