Sample Environmental Engineering Environmental Bids

The following bids match your criteria:

Please note, the bids summarized below are real EXAMPLES of EXPIRED bid opportunities. The full project description and contact information can be obtained by subscribing to envirobidnet.com.

We also offer a free TRIAL subscription that allows you to receive the FULL bid information for a 30 day evaluation period.

30 Day Free Trial

Bid State Current EnvEngineering Bids
513690 NJ Bloomfield Township Board of Education : Proposed ESCO Energy Savings Improvements for Demarest Elementary School Franklin Elementary School. Notice is hereby
518852 SC SC DOT: LOI HORRY COUNTY RIDE III PROGRAM FORESTBROOK ROAD WIDENING: consulting firms experienced in providing engineering services for the Forestbrook Road Wid
515673 FL Miami Beach: (RFQ) *ADDENDUM 1* for (Envirobidnet Original bid # 511131) Architectural and Engineering Services for Historic District Resiliency and Adaptation
516792 FL Fort Myers: (RFQ) for (Envirobidnet Original bid#514345) Winkler Canal Shared Use Path Feasibility Study. Consultants shall be FDOT prequalified in Category 13
516443 CA Healdsburg: Development of Local Hazard Mitigation Plan. A consultant is being sought to manage, coordinate, prepare, and administer the development of a Local
516372 FL FL DOT DIST 5: (LOI) I-75/ SR 93 Sumter County Rest Area Reconstruction 438562-2 NB and 438562-3 SB Major Work : 14.0 - Architect Minor Work : 3.2
516144 IN Peru: IOCRA Grant Administrative Proposal: RFP to provide grant management, environmental review and labor standards related to a Water System Improvements Proj
514963 CT Brookfield: Environmental Assessment of Property and Structure at 20 Station Rd, Brookfield CT State of CT Brownfield grant funds will be utilized Location is a
513968 NY NYC DEP: *ADDENDUM 1* to (ENVIROBIDNET ORIGINAL BID #512688) NR-120-DES: WEST ODOR CONTROL FACILITIES AT NORTH RIVER WWTP **DUE DATE EXTENDED, PRE-BID MEETING D
514930 MA Cambridge: Millers River Revitalization and Redevelopment Estimated Construction Cost: $75,000,000 Time Period for Completed Project: Design - 15 months; Con
515927 LA East Ascension: (RFQ) Engineering consulting assistance to EACGDD1 and Ascension Parish in developing a comprehensive and detailed Floodplain Management Plan. T
516462 MN Dakota County: Mississippi River Trail Stockyards Node. Dakota County is seeking final interpretive design and fabrication documents for the South Saint Paul
512665 NE OMAHA: Omaha Exterior Paint Stabilization Program for the EPA Omaha Lead Site Group #423.
512209 OR Port of Portland: PDXNext North Terminal Heating Water Piping Replacement Design Services. Design services related to the PDXNext North Terminal Heating Water P
513451 LA Vinton: (RFQ) ENGINEERING SERVICES AND ADMINISTRATIVE SERVICES. The Town of Vinton is applying for a grant under the FY 2018 - FY 2019 Louisiana Community Devel
510819 NY Lakewood: Lakewood/Busti Stormwater Management Engineering Study. This RFP is being distributed by the Chautauqua Lake & Watershed Management Alliance (Alliance
522357 CA San Luis Obispo: *ADDENDUM 2* (ORIGINAL ENVIROBIDNET # 519833) Froom Ranch Specific Plan Project. Preparation of an Environmental Impact Report (EIR) for the Fr
522286 CA Riverside - Western Municipal Water District: *ADDENDUM 1* (ORIGINAL ENVIROBIDNET # 521908) Construction Inspection Support Services. Qualified consultant firms
520097 CA San Diego County Water Authority: Planning and Evaluation of Water-Use Efficiency Programs. The San Diego County Water Authority is soliciting proposals from qu
519867 NY Hempstead: (RFQ) Lead-Base Paint Testing and Evaluation Services. The Town Of Hempstead, Department of Planning & Economic Development is requesting proposals f
521067 VA Metropolitan Washington Airports Authority: *ADDENDUM 1* (for Original ENVIROBIDNET Bid# 518312) Miscellaneous Design/Build Projects (MACC), National and Dulles
510871 MD Calvert County: *ADDENDUM 1 )*(ENVIROBIDNET ORIGINAL BID #510588) TITLE CREEK WATER QUALITY STUDY Water Supply Analysis, Infrastructure Analysis, Water Quality
511736 CT NHCOG: Consultant to carry out the HouBike Trail Alignment Study.
514556 FL Pinellas Park Water Management District: Qualified and experienced consulting firms to provide general engineering and related services with respect to stormwat
513634 ID Lewiston: (RFQ) ENGINEERING SERVICES East Orchards Sewer Expansion Phase 1 & Phase II. The City of Lewiston is seeking Statements of Qualifications (SOQs) fr
514696 CA Rancho Mirage: ON-CALL STORM WATER CONSULTANT SERVICES. The City of Rancho Mirage is seeking a qualified, competent and professional firm to act as a part-time,
513259 CA Modesto: *ADDENDUM 1* (ORIGINAL ENVIROBIDNET # 513041) Engineering Plan Check and Design Review Services for SR132 Freeway/Expressway - Phase 1 Project.
514992 WA WSDNR: Site Preparation Ground Herbicide Contract for the Pacific Cascade Region.
514993 WA WSDNR: Site Preparation Ground Herbicide Contract for the Pacific Cascade Region.
514790 FL THE POLK REGIONAL WATER COOPERATIVE:CONSULTING SERVICES (CCNA) FOR THE PHASE I COMBINED PROJECT ONE OR MORE CONSULTANTS FOR THE PHASE I SCOPE OF WORK FOR THRE
521191 FL JEA: (RFQ) *ADDENDUM 4* for (Envirobidnet Original bid#517035) Engineering Services for the District II Primary Clarifier #2 and #3 Rehabilitation Project Pr
514377 OR Bend: Solid Waste Management Plan. The Deschutes County Department of Solid Waste is requesting proposals to develop a solid waste management plan in anticipati
516500 UT Roosevelt City: (SOQ) 2017 Hancock Cove Sewer Project. Work performed under this project shall consist of, but is not limited to, furnishing PreConstruction Eng
516848 AZ Phoenix: *Addendum#1* FOR (ENVIROBIDNET ORIGINAL BID#514894) Provide supplemental services to assist Environmental Plannings Historic Preservation Team.
516037 CA Fresno: *ADDENDUM 1* (ORIGINAL ENVIROBIDNET # 514527) (RFQ) Quality Control and Inspection Services for New Production Wells at Pump Stations 51A, 60A, 156, 210
515569 CA Modesto: *ADDENDUM 2* (ORIGINAL ENVIROBIDNET # 513041) Engineering Plan Check and Design Review Services for SR132 Freeway/Expressway - Phase 1 Project.
515650 AR Stone County: (RFQ) ENGINEERING SERVICES to provide the necessary services for roads, bridges, water/sewer, drainage and economic development projects involv
515822 CA Northern Region - CA Department of Motor Vehicles: *ADDENDUM 1* (ORIGINAL ENVIROBIDNET # 514440) As-Needed Hazardous Material Investigation, Analysis, and Abate
515823 CA Southern Region - CA Department of Motor Vehicles: *ADDENDUM 1* (ORIGINAL ENVIROBIDNET # 514438) As-Needed Hazardous Material Investigation, Analysis, and Abate
520075 OH Cleveland - NEORSD: (RFQ) Stormwater General Engineering Services 2 project for implementation support with the design and construction of stormwater projects.
519485 OR Eagle Point: (RFQ) *Document added* FOR (ENVIROBIDNET ORIGINAL BID#519029) Engineering Services City of Eagle Point Linn Road Improvements. Closing Date and Tim
512265 CO City of Fountain: 2017 Energy Performance Contracting.
510492 CO City of Pueblo: Union Avenue Bridge Pre-Scoping Report. The City of Pueblo (City) is requesting the services of a consulting engineering firm (Consultant) to
516606 FL Melbourne Airport Authority (MLB):(RFQ) *ADDENDUM 1* for (Envirobidnet Original bid#515063)Continuing Professional Service Consultants at Large Services will in
506191 CA San Diego County: *ADDENDUM 3* (ORIGINAL ENVIROBIDNET # 502388) (RFQ) AS NEEDED CONSULTANT SERVICES FOR CEQA SUPPORT, RESOURCE MONITORING and BIOLOGICAL RESTORA
502893 VA Prince William County: *ADDENDUM 2*(ENVIROBIDNET ORIGINAL BID # 500450)Engineering, Design, and Construction Administration/Management Services
502251 MD Maryland Port Administration: Dredging and Coastal Engineering Consulting Services **BID DEADLINE EXTENSION 03/17/17**
504065 ND Fargo: Engineering firms for the following projects: Sewer Design Services, North Broadway Bridge over the Red River Structural Study.
501890 CA Thousand Oaks: Hill Canyon Wastewater Treatment Plant Aquatic Bioassay Testing.
501544 MA MWRA: Peabody Water Pipeline Project Section 109 Extension SCOPE: Design, Engineering Services During Construction and Resident Engineering/Inspection Services

30 Day Free Trial